Author Archives: skokiecentralchurch

Central’s 3rd Annual Holiday Extravaganza in the renovated Log Cabin on Dec 10, 2011

Hello Log Cabin friends!   If you haven’t had a chance to see our renovated Log Cabin, now’s your chance.  Nothing more beautiful than the Log Cabin at Christmastime.  This Saturday, December 10th, from 11 a.m. to 3 p.m. is Central’s 3rd … Continue reading

Posted in Uncategorized | Leave a comment

The Log Cabin has been bustling post-renovation!

The Log Cabin has been bustling post-renovation!  Wow…so much has been going on.  I thought, somehow, life would slow down ever-so-slightly after Phase One of the Log Cabin Renovation was complete.  Ah well…it’s all good!  And the Log Cabin has … Continue reading

Posted in Uncategorized | 1 Comment

2010.11.24 We Are Thankful! Phase I+ Is Complete

Talk about Gratitude!  And what a day of Thanksgiving.  Central Church folks got to see the Log Cabin for the first time since its doors closed in April for the renovation.  In addition to the planned necessary upgrades – roof, … Continue reading

Posted in Uncategorized | Leave a comment

2010.November – Log Staining, Chinking, Window Installation, and Major Cleaning!

Hello Log Cabin Fans!  November, 2010 – Much, much to report! Check out the pics of all hard at work and scroll down to read about what’s been happening. LOG STAINING AND CHINKING:  I was telling Kathy Shine, our Log Blog … Continue reading

Posted in Uncategorized | Leave a comment

2010.October – Exterior Log Work, Windows & Doors; Interior Electrical Work

Hi all!  Wow….it has been another busy few weeks with lots to report!  LOG WORK From all accounts, it seems we fared better than originally planned in terms of necessary log replacement.  Only a handful of spots required FULL log … Continue reading

Posted in Uncategorized | Leave a comment

2010.09.07 Log Work Begins

Hello All!  Wow…can’t believe it has been a month since I posted an update.  Sorry!  Lots, LOTS has been happening at the cabin (not to mention my mom and one of my best friends and her 2 daughters moving up … Continue reading

Posted in Uncategorized | 2 Comments

2010.08.06 Roof Update – Foaming is Finished

Hey Log Cabin lovers,   Here’s a quick roof update.  We’ve been anxiously awaiting the Foam Guys – since the foam makes the roof almost completely waterproof.  We’ve gotten way too much water into the Great Room!  Ugh!   So the foam crew … Continue reading

Posted in Uncategorized | 1 Comment